PT21
Collects the initial requirements, coordinates the engineering solution and specification, and organises supply, installation, commissioning, and service.
PT21 / Company
PT21 connects building requirements, engineering, factory specification, supply, installation, and ongoing service.

What PT21 does
Each work area connects to the next, so decisions remain consistent from design through operation.
Full processDefining requirements and checking solution feasibility.
02Shaft, traffic, interfaces, finishes, and model-specific documentation.
03Specification, production tracking, delivery, unloading, and completeness.
04Readiness coordination, installation, adjustment, testing, and handover.
05Planned maintenance, diagnostics, repair, and development of existing systems.
Project / 01
The interactive technical model shows the shaft, car, stair core, pit, and overhead as one architectural system.
Open project
Technical modelWho does what
Roles are defined at the start so drawings, equipment scope, and site readiness progress together.
Collects the initial requirements, coordinates the engineering solution and specification, and organises supply, installation, commissioning, and service.
Produces the approved equipment package and provides factory documentation for the selected model.
Keeps project information current, confirms interfaces and finishes, and prepares the shaft, power, and installation access.
Partner line
The model, specification, and support terms are confirmed in the technical and commercial proposal for each building.
FUJI technologiesFirst contact
We start with the building context and define the information needed for the next step.
Discuss the task