PT21 / Building 02
Office buildings
Handling capacity, peak traffic, access control, and stable group operation.

Core challenge
High trip volume concentrated at the beginning and end of the workday.
The configuration is defined after traffic, architecture, and operation are reviewed. Generic values do not replace project-specific analysis.
Project priorities
What must be coordinated together.
Group control
Access control and BMS
Downtime reduction
Relevant solution areas
Equipment types for further assessment.
This list is not an automatic specification; the final configuration follows engineering assessment.

01Elevator
Passenger elevators
For residential, commercial, and public buildings, sized around actual passenger traffic.
MRL · SMR · MRExplore
06Elevator
High-rise elevator systems
Quantity, speed, and control strategy are defined through traffic analysis.
High-speed passenger elevatorExploreFor the first assessment
Prepare three information groups.
- Staff and visitor population
- Operating schedule
- Access zoning
Start the project
Describe the building and current stage.
Even before plans are issued, the process can start from the functional programme and constraints.
Discuss building