Skip to content

PT21 / Building 05

High-rise buildings

Traffic, zoning, speed, ride quality, and system integration.

Elevator system for a high-rise tower
HIGH-RISE

Core challenge

Shaft-count or control-strategy errors are difficult to correct after the core is fixed.

The configuration is defined after traffic, architecture, and operation are reviewed. Generic values do not replace project-specific analysis.

Project priorities

What must be coordinated together.

01

Traffic simulation

02

Zoning

03

Ride quality

04

Engineering coordination

For the first assessment

Prepare three information groups.

  • Building programme
  • Design population
  • Core plan

Start the project

Describe the building and current stage.

Even before plans are issued, the process can start from the functional programme and constraints.

Discuss building